[1]
Su, D. et al. 2022. Construction of lean control system of prefabricated mechanical building cost based on Hall multi-dimensional structure model. Informatica. 46, 3 (Sep. 2022). DOI:https://doi.org/10.31449/inf.v46i3.3914.